{"id":18627,"date":"2026-11-15T15:53:09","date_gmt":"2026-11-15T14:53:09","guid":{"rendered":"https:\/\/www.tcs-engineering.de\/?p=18627"},"modified":"2026-11-15T15:53:27","modified_gmt":"2026-11-15T14:53:27","slug":"early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres","status":"publish","type":"post","link":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/","title":{"rendered":"Early-Access Mode in the Data Center: Can Electrical Responsibility Be Managed Safely with Interim-CRES?"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1352px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><h2>Early Access Creates Multiple Worlds at Once<\/h2>\n<p>During the early access phase of a data center, construction, commissioning, and initial operations run in parallel. While one area may still be a construction site, the next is already in the start-up phase, and a third is already being handed over to a user. Technically, these areas are often interconnected. From an organizational standpoint, therefore, a blanket statement that the operator is responsible is not sufficient. Responsibility must be clearly assigned based on the system, area, and timing.    <\/p>\n<h2>Approval gates for each phase transition<\/h2>\n<p>A phase-based gate should reliably define the actual status, the system boundary, the control function, permitted activities, and required documentation. This is particularly important when a facility is powered up for the first time or when control transfers from the project phase to the operational phase. The gate process prevents the organizational status from lagging behind the technical reality.  <\/p>\n<h2>The permit and activation must be appropriate for the phase<\/h2>\n<p>Permit procedures and work authorizations are important, but they only work if they reflect the current status. Shared lockouts across multiple employers require clear control and release procedures. Any change in status must be communicated effectively. A note in the project plan is not sufficient if, in the meantime, a distribution panel that was previously de-energized has been energized on-site.   <\/p>\n<h2>Interim CRES as the undisputed technical authority<\/h2>\n<p>If the future internal <a href=\"https:\/\/vefk-verantwortliche-elektrofachkraft.de\/\" target=\"_blank\" rel=\"noopener noreferrer\">electrical engineering organization<\/a> is not yet fully operational during Early Access, an external CRES can effectively assume a technical leadership role on an interim basis. Its scope must therefore be clearly defined, as must its decision-making authority, autonomy in the delegated area, access to information, and escalation procedures. It does not replace the responsibilities of other employers or project coordination. In this way, it stabilizes the organization at a particularly dynamic interface.   <\/p>\n<h2>Transitional states need an owner<\/h2>\n<p>Temporary states that persist across multiple teams or project phases are particularly problematic. For each such state, however, it should be clear who is technically responsible for monitoring it, what restrictions apply, and how it will be terminated. Otherwise, a temporary solution without a clear owner will quickly become an invisible permanent solution.  <\/p>\n<h2>Transition to Normal Operations<\/h2>\n<p>From the outset, the interim solution should be designed with the eventual handover in mind. Roles, procedures, the qualifications matrix, and outstanding issues must be documented in such a way that the operator can assume technical responsibility. This makes Early Access manageable and prevents interim solutions from becoming permanent without anyone noticing.  <\/p>\n<h2>Checkpoints<\/h2>\n<ul>\n<li>Status by Area<\/li>\n<li>System Limits<\/li>\n<li>oversight function<\/li>\n<li>Permitted Activities<\/li>\n<li>clear communication<\/li>\n<\/ul>\n<h2>Conclusion<\/h2>\n<p>Early Access is, above all, a challenge posed by changing technical conditions and shifting lines of responsibility. An <a href=\"https:\/\/www.tcs-engineering.de\/en\/interim-cres\/\">interim CRES<\/a> can effectively stabilize this phase when internal technical leadership is not yet fully established and the role is being integrated into the organization. <\/p>\n<p><a href=\"https:\/\/www.tcs-engineering.de\/en\/contact\/\">We&#8217;d be happy to review the accountability structure for Early Access and the transition to production with you. (click) <\/a><\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>During the early access phase of a data center, construction, commissioning, and initial operations take place simultaneously. One area is still a construction site, the next is already in the start-up phase, and a third is already being handed over to a user. <\/p>\n","protected":false},"author":5,"featured_media":18628,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[133],"tags":[],"class_list":["post-18627","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cres-and-the-electrical-organization"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.9 (Yoast SEO v28.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Interim CRES in the Data Center: Managing Early Access<\/title>\n<meta name=\"description\" content=\"Interim CRES in the Data Center: How to Safely Manage Electrical Responsibilities, Approvals, and Transitional States During Early Access.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electrically Safe Control of Early Access in the Data Center\" \/>\n<meta property=\"og:description\" content=\"An interim CRES can effectively organize responsibilities, approvals, and escalation procedures during dynamic transitional periods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/\" \/>\n<meta property=\"og:site_name\" content=\"TCS-Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-15T14:53:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-15T14:53:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/a20.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"500\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Matthias Surovcik\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Early-Access Mode in the Data Center: Can Electrical Responsibility Be Managed Safely with Interim-CRES?\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Matthias Surovcik\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/\"},\"author\":{\"name\":\"Matthias Surovcik\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#\\\/schema\\\/person\\\/68567d17bc251ce86a072f8e5a21c363\"},\"headline\":\"Early-Access Mode in the Data Center: Can Electrical Responsibility Be Managed Safely with Interim-CRES?\",\"datePublished\":\"2026-11-15T14:53:09+00:00\",\"dateModified\":\"2026-11-15T14:53:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/\"},\"wordCount\":815,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.tcs-engineering.de\\\/wp-content\\\/uploads\\\/a20.jpg\",\"articleSection\":[\"CRES and the Electrical Organization\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/\",\"url\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/\",\"name\":\"Interim CRES in the Data Center: Managing Early Access\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.tcs-engineering.de\\\/wp-content\\\/uploads\\\/a20.jpg\",\"datePublished\":\"2026-11-15T14:53:09+00:00\",\"dateModified\":\"2026-11-15T14:53:27+00:00\",\"description\":\"Interim CRES in the Data Center: How to Safely Manage Electrical Responsibilities, Approvals, and Transitional States During Early Access.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.tcs-engineering.de\\\/wp-content\\\/uploads\\\/a20.jpg\",\"contentUrl\":\"https:\\\/\\\/www.tcs-engineering.de\\\/wp-content\\\/uploads\\\/a20.jpg\",\"width\":500,\"height\":500,\"caption\":\"Early Access Interim CRES\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Homepage\",\"item\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Early-Access Mode in the Data Center: Can Electrical Responsibility Be Managed Safely with Interim-CRES?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/\",\"name\":\"TCS-Engineering.de\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#organization\",\"name\":\"Technology Consulting Solutions GmbH\",\"url\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.tcs-engineering.de\\\/wp-content\\\/uploads\\\/tcs_blue_logo_orig.png\",\"contentUrl\":\"https:\\\/\\\/www.tcs-engineering.de\\\/wp-content\\\/uploads\\\/tcs_blue_logo_orig.png\",\"width\":1814,\"height\":1082,\"caption\":\"Technology Consulting Solutions GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/#\\\/schema\\\/person\\\/68567d17bc251ce86a072f8e5a21c363\",\"name\":\"Matthias Surovcik\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f526675f2b49481e0664fb30bf786d183c2ea5faf46c3929fc6efd74826ce4d5?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f526675f2b49481e0664fb30bf786d183c2ea5faf46c3929fc6efd74826ce4d5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f526675f2b49481e0664fb30bf786d183c2ea5faf46c3929fc6efd74826ce4d5?s=96&d=mm&r=g\",\"caption\":\"Matthias Surovcik\"},\"url\":\"https:\\\/\\\/www.tcs-engineering.de\\\/en\\\/author\\\/tcs-engineering\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Interim CRES in the Data Center: Managing Early Access","description":"Interim CRES in the Data Center: How to Safely Manage Electrical Responsibilities, Approvals, and Transitional States During Early Access.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/","og_locale":"en_US","og_type":"article","og_title":"Electrically Safe Control of Early Access in the Data Center","og_description":"An interim CRES can effectively organize responsibilities, approvals, and escalation procedures during dynamic transitional periods.","og_url":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/","og_site_name":"TCS-Engineering","article_published_time":"2026-11-15T14:53:09+00:00","article_modified_time":"2026-11-15T14:53:27+00:00","og_image":[{"width":500,"height":500,"url":"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/a20.jpg","type":"image\/jpeg"}],"author":"Matthias Surovcik","twitter_card":"summary_large_image","twitter_title":"Early-Access Mode in the Data Center: Can Electrical Responsibility Be Managed Safely with Interim-CRES?","twitter_misc":{"Written by":"Matthias Surovcik","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#article","isPartOf":{"@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/"},"author":{"name":"Matthias Surovcik","@id":"https:\/\/www.tcs-engineering.de\/en\/#\/schema\/person\/68567d17bc251ce86a072f8e5a21c363"},"headline":"Early-Access Mode in the Data Center: Can Electrical Responsibility Be Managed Safely with Interim-CRES?","datePublished":"2026-11-15T14:53:09+00:00","dateModified":"2026-11-15T14:53:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/"},"wordCount":815,"commentCount":0,"publisher":{"@id":"https:\/\/www.tcs-engineering.de\/en\/#organization"},"image":{"@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#primaryimage"},"thumbnailUrl":"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/a20.jpg","articleSection":["CRES and the Electrical Organization"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/","url":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/","name":"Interim CRES in the Data Center: Managing Early Access","isPartOf":{"@id":"https:\/\/www.tcs-engineering.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#primaryimage"},"image":{"@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#primaryimage"},"thumbnailUrl":"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/a20.jpg","datePublished":"2026-11-15T14:53:09+00:00","dateModified":"2026-11-15T14:53:27+00:00","description":"Interim CRES in the Data Center: How to Safely Manage Electrical Responsibilities, Approvals, and Transitional States During Early Access.","breadcrumb":{"@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#primaryimage","url":"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/a20.jpg","contentUrl":"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/a20.jpg","width":500,"height":500,"caption":"Early Access Interim CRES"},{"@type":"BreadcrumbList","@id":"https:\/\/www.tcs-engineering.de\/en\/early-access-mode-in-the-data-center-can-electrical-responsibility-be-managed-safely-with-interim-cres\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Homepage","item":"https:\/\/www.tcs-engineering.de\/en\/"},{"@type":"ListItem","position":2,"name":"Early-Access Mode in the Data Center: Can Electrical Responsibility Be Managed Safely with Interim-CRES?"}]},{"@type":"WebSite","@id":"https:\/\/www.tcs-engineering.de\/en\/#website","url":"https:\/\/www.tcs-engineering.de\/en\/","name":"TCS-Engineering.de","description":"","publisher":{"@id":"https:\/\/www.tcs-engineering.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.tcs-engineering.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.tcs-engineering.de\/en\/#organization","name":"Technology Consulting Solutions GmbH","url":"https:\/\/www.tcs-engineering.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.tcs-engineering.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/tcs_blue_logo_orig.png","contentUrl":"https:\/\/www.tcs-engineering.de\/wp-content\/uploads\/tcs_blue_logo_orig.png","width":1814,"height":1082,"caption":"Technology Consulting Solutions GmbH"},"image":{"@id":"https:\/\/www.tcs-engineering.de\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.tcs-engineering.de\/en\/#\/schema\/person\/68567d17bc251ce86a072f8e5a21c363","name":"Matthias Surovcik","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f526675f2b49481e0664fb30bf786d183c2ea5faf46c3929fc6efd74826ce4d5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f526675f2b49481e0664fb30bf786d183c2ea5faf46c3929fc6efd74826ce4d5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f526675f2b49481e0664fb30bf786d183c2ea5faf46c3929fc6efd74826ce4d5?s=96&d=mm&r=g","caption":"Matthias Surovcik"},"url":"https:\/\/www.tcs-engineering.de\/en\/author\/tcs-engineering\/"}]}},"_links":{"self":[{"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/posts\/18627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/comments?post=18627"}],"version-history":[{"count":5,"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/posts\/18627\/revisions"}],"predecessor-version":[{"id":18677,"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/posts\/18627\/revisions\/18677"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/media\/18628"}],"wp:attachment":[{"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/media?parent=18627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/categories?post=18627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tcs-engineering.de\/en\/wp-json\/wp\/v2\/tags?post=18627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}