Electrical work doesn’t begin on the first day of production
A new production facility takes months to plan, procure, construct, and commission. Nevertheless, the electrical layout of the facility is sometimes not considered until shortly before completion. This is too late, because even during the planning and commissioning phases, system configurations, access points, approvals, and lines of responsibility are established that will later determine how the facility operates. Those who organize early on don’t just save on paperwork in the end—they also avoid actual structural modifications and operational inefficiencies.
Organization is based on assets and tasks
Distribution systems, machinery, charging infrastructure, photovoltaic systems, BESS, testing facilities, and maintenance each have different requirements. The organization should therefore base its structure not on job titles, but on facilities, activities, and hazards. A qualification matrix links individuals to specific tasks, limits, supervision, and operational authorization. A certification title alone says little about whether someone is permitted to perform a specific switching operation or authorization on that exact piece of equipment.
Ensure a Smooth Handover of Construction and Operations
During the construction phase, the systems are often monitored by different organizations than those responsible for operations later on. For this reason, handover points must be carefully defined for each facility. Operating procedures should address switching, de-energizing, maintenance, malfunctions, third-party contractors, and changes even before the handover. Partial handovers are possible but increase the demands on system boundaries and communication.
The technical structure will change when production begins
During commissioning, operational statuses often change more quickly than organizational charts. New power inputs become active, machines transition from the assembly stage to test operation, and temporary power supplies are decommissioned. The chain of command must adapt to these transitions. Only then is it clear at all times who is in control of a system and what work is permitted under the current conditions.
Interim CRES at the Start
If the internal technical management structure is still being established, an external CRES can serve as an interim solution to stabilize the launch and early operations. This individual must be involved in actual decision-making and have the appropriate authority. At the same time, internal expertise should be developed so that the role can be handed over in an orderly manner later on. This ensures that the arrangement does not become a permanent external stopgap, but rather a controlled development phase.
Checkpoints
- Record Assets
- Assign Tasks
- Rate the qualification
- Define Operating Procedures
- Prepare for the handover
Conclusion
A new production facility needs its electrical infrastructure in place well before production begins. Bringing together systems, responsibilities, authorities, and qualifications early on ensures a more stable start. An interim CRES can effectively support this phase if the internal structure is not yet fully established.